How Many Coats Of Polyurethane Should You Put On Hardwood Floors?

How do you smooth the final coat of polyurethane?

Sand lightly with 240-grit sandpaper between coats, then let the last coat dry for at least 24 hours.

This is standard practice with any wood finishing job, and is nothing out of the ordinary.

That said, sanding bare wood beforehand to create a smooth foundation is key..

Do I have to sand between coats of polyurethane?

Here’s the way to approach sanding between coats: Do it anyway. Polyurethane dries slowly, so there are always dust nibs that should be sanded out before the next coat is applied. … Use a sandpaper grit that removes the flaws efficiently without creating deeper scratches than necessary.

Can you use steel wool to sand between coats of polyurethane?

Using steel wool or sand paper allows you to create a uniform surface for the next coat of polyurethane, which generally looks nicer, more professionally, etc. In my experience, assuming the finish is dry, there isn’t a difference other than the coarseness of the sand paper or steel wool.

Can I use just one coat of polyurethane?

One coat of an oil based finish is not enough to provide much protection or a good appearance. The first coat primarily is absorbed into the wood leaving little finish on the surface. It also causes some surface wood shards to swell causing the surface to feel rough.

Can you put too many coats of polyurethane?

Generally, more than 3 coats of poly doesn’t do much good. It’s really not needed nor recommended. Each additional coat needs to be buffed so you are kind of buffing off half of the previous layer. … It’s kind of like nail polish where it takes longer and longer to dry and cure for each coat.

Do you really need 3 coats of polyurethane?

There needs to be 3 coats of Polyurethane applied, especially if you are using an oil-based finish. The first coat should be mixed with mineral spirits. This acts as a sealer and provides a barrier between the wood and the oil finish you are using. A bristle brush is needed to apply the coats.

What happens if you don’t sand between coats of polyurethane?

Failing to sand between coats of polyurethane does not have a significant impact on the finish. Even so, I still advise that you sand between the coats when applying polyurethane as this will help increase the adhesion between the layers to give you a more level finish.

Is 2 coats of polyurethane enough?

You are best off using 3 coats of water based polyurethane for the best results. … Not only is water borne polyurethane thinner, but it also raises the grain of the wood, so the floors can sometimes feel rough with just 2 coats of poly (especially if it’s a cheap brand of poly).

How long should you wait between coats of polyurethane?

Recoat within 2 hours. If unable to do so, wait a minimum of 72 hours, then lightly sand and recoat. Apply at least three coats on unfinished wood and two coats on surfaces already finished. After final coat, allow 24 hours before normal use.

What is the best applicator for polyurethane?

Applying Oil-Based Polyurethane Apply oil-based poly using a fine-bristled brush (natural or synthetic bristles) or a foam brush. Avoid inexpensive bristle brushes, as these tend to leave obvious brush strokes. Foam brushes are inexpensive (and disposable) and work well for most flat surfaces.

Can you apply a second coat of polyurethane without sanding?

Apply two to three additional coats of full-strength polyurethane, sanding between each coat. When applying polyurethane, brush along the grain, stretching the polyurethane into as thin a coat as possible. Always allow polyurethane to dry 24 to 48 hours before sanding, to give the surface time to cure and harden.

How do you fix imperfections in polyurethane?

For gaps in the finish—usually near the edges—scuff sand the finish around the gap with 320-grit sandpaper without touching the bare area. Then apply finish to the bare wood, feathering the wet edge against the edge of the cured coat.

How many coats of polyurethane should you put on a floor?

How Many Coats Of Polyurethane Should You Put On A Wood Floor? The number of coats you apply depends on the type of product you’re using. For oil-based products, it’s usually enough to have two coats or a maximum of three.

How long does it take for polyurethane to cure?

4 weeksIt’s the curing that makes the finish hard, durable and creates the full adhesion with the floor. This curing process can take up to 4 weeks or so depending on environmental conditions (e.g. humidity) and how thick a film was applied and number of coats of polyurethane.

Should I sand after the last coat of polyurethane?

Thereof, do you sand after last coat of polyurethane? You shouldn’t have to sand the final coat. You apply the final coat, let it dry and you’re done. When you sand and rub out the final finish you take off most of the surface which contains the satin.